A key stage in the construction of P&O Cruises’ next ship has been marked by Meyer Werft. The team building the 184,000-tonne Arvia celebrated the keel laying with a traditional coin-laying.
Source link
Film and Music Electronic Magazine
A key stage in the construction of P&O Cruises’ next ship has been marked by Meyer Werft. The team building the 184,000-tonne Arvia celebrated the keel laying with a traditional coin-laying.
More Stories
The RV Camping Mistakes I Wish I’d Avoided Before My First Road Trip
Over 100,000 connections made at IBTM World 2022
UNWTO and European Commission share joint vision for tourism’s future